● After opening the box, check the reference packing list, make sure that you have all parts
and there are no damages.
If you find any shortage or damage, please contact your retailer.
1.3 Structure
The placement should always be higher than the tank
Input tube should be as short as possible in order to avoid reflux, output tube should
be above the containe. Please check carefully after connecting you tubes, make sure they
are not backwards.
4