Pioneer DV-49AV Service Manual page 35

Hide thumbs Also See for DV-49AV:
Table of Contents

Advertisement

5
2. REMOVAL OF DVD DECK PARTS
QQ
3 7 63 1515 0
NOTE
1. Disassemble only the DVD DECK PARTS parts listed
here. Minute adjustments are needed if the disassembly
is done. If the repair is needed except listed parts,
replace the DVD MECHA ASS'Y.
2-1: TRAY (Refer to Fig. 2-1-A)
1. Set the Tray opened. (Refer to the DISC REMOVAL
METHOD AT NO POWER SUPPLY)
2. Unlock the 2 supports
Tray.
Push to Sag
Tray
NOTE
1. In case of the Tray installation, install them as the circled
section of Fig. 2-1-B so that the each markers are met.
TE
L 13942296513
2-2: TRAVERSE ASS'Y (Refer to Fig. 2-2-A)
1. Remove the screw
2. Unlock the 2 supports
3. Remove the Insulator (R) from the Loader Sub Ass'y.
4. Remove the Traverse Ass'y.
Loader Sub Ass'y
Traverse Ass'y
www
• Screw Torque: 2.0 ± 0.3kgf•cm
.
5
http://www.xiaoyu163.com
6
and draw it while sagging the
Loader Ass'y
Push to Sag
Fig. 2-1-A
Loader Ass'y
Tray
Fig. 2-1-B
.
.
Insulator (R)
x
ao
u163
Fig. 2-2-A
y
i
6
http://www.xiaoyu163.com
7
NOTE
2 9
8
1. In case of the Traverse Ass'y, install it from (1) to (4) in
order. (Refer to Fig. 2-2-B)
2. In case of the Traverse Ass'y installation, hook the wire
on the Loader Ass'y as shown Fig. 2-2-C.
Loader Ass'y (Bottom Side)
Q Q
3
6 7
1 3
1 5
2-3: LOADING MOTOR PCB ASS'Y/ LOADING BELT
(Refer to Fig. 2-3-A)
1. Remove the Loading Belt.
2. Remove the screw
3. Remove the Loading Motor PCB Ass'y.
4. Remove the 2 screws
5. Remove the Loading Motor.
6. Remove the Gear Pulley.
Loading Belt
• Screw Torque: 2.5 ± 0.3kgf•cm (Screw
• Screw Torque: 1.0 ± 0.3kgf•cm (Screw
co
.
DV-49AV
7
8
9 4
2 8
Rack Loading
Holder Traverse
Traverse Ass'y
Check Lock
Loader Ass'y
0 5
8
2 9
9 4
2 8
Check Hook
.
.
Loading Sub Ass'y
Gear Pulley
Loading Motor PCB Ass'y
m
)
)
8
9 9
A
B
Fig. 2-2-B
C
9 9
Fig. 2-2-C
D
E
Fig. 2-3-A
F
35

Advertisement

Table of Contents
loading

Table of Contents