Vacuum And Add Refrigerant - Midea MAD020T1N1S1 Technical Manual

Precision air conditioner
Hide thumbs Also See for MAD020T1N1S1:
Table of Contents

Advertisement

MCAC-PDSM
M-2013-04
the
e operation o
pip
pe in the pro
the
e pipe to the
Th
he electroma
3.5 Vacuu
um and ad
Aft
ter finished
the
en filled with
for
r 24 hours.
Un
nder the pipe
sys
stem loop to
gla
asses in indo
Aft
ter the vacu
am
mount liquid
If t
the connecti
12
2kg.
Wh
hen the con
sys
stem for the
as
the folling f
of the comp
ressor and i
ocess of pipe
e intallation.
e outdoor un
nits.
agnetic valve
e wire conne
d refriger
ant
piping conne
ection betwe
2
h 30kgf/cm
nitrogen fro
eline pressu
urizing was n
o below 20P
Pa, and keep
oor unit will
indicate to b
um inspectio
on, the refrig
refrigerant a
and adds su
ng pipe leng
gth of indoor
necting pipe
e length is m
e system nor
rmal operatio
formula:
Midea
a Precision AC
its lifespan.T
Trash and fo
Be sure to
blow them o
ection as the
e following f
Si
ingle-syste
m type
Dua
al-system t
type
een the indo
oor and outd
m the outdo
oor unit cove
no problem,
use vacuum
p for 2 hours
s, if the pres
be green.
geration sys
stem should
uitable amou
unt refrigeran
r unit and ou
utdoor unit is
more than 10
0m, then it n
on. The calc
culation for t
Technical Ma
anual-Down D
oreign matte
ers may com
off with niltro
ogen before
igure:
door unit, op
pen all ball v
er connector
r, and then p
m pump to va
acuum refrig
sure is no p
picks up, the
static filling
quickly by p
nt oil.
s within 10m
m, the filling
eeds to add
d refrigerant
the added q
uantity of re
elivery Series
me into the
connecting
alves, and
pressurizing
geration
liquid sight
pecified
refrigerant is
s
into the
efrigerant is
49
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents