Midea MAD020T1N1S1 Technical Manual page 48

Precision air conditioner
Hide thumbs Also See for MAD020T1N1S1:
Table of Contents

Advertisement

MCAC-PDSM
M-2013-04
pro
ocess, it nee
Ma
ake sure the
Ma
ake sure the
Fil
l refrigerant
Th
he pipeline p
sh
ould be con
If o
one way equ
ou
tdoor units i
wh
hether need
Outdoo
Outdoo
Ins
stall grease
Th
he suggested
elb
bow and the
to
the site con
Outd
liquid
Wh
hen the unit
ou
tdoor unit is
ma
aterials befo
Wh
hen welding
va
lve before w
an
d side pane
eds to charg
ge nitrogen i
e right conne
ecting pipe s
e outdoor un
nit installation
and add ref
frigerant and
pressure dro
ps, compres
sidered duri
ing the desig
uivalent leng
gth is longer
is higher tha
an the numb
to add the e
extended co
R
Relative posi
or unit installe
ed level is hi
or unit installe
ed level is low
traps (oil loo
op) every 7.5
d pipeline si
zes in the fo
e valve have
counted. Th
ditions.
door diamete
er of
d pipe (Inch
)
90° B
3/8
1/2
5/8
3/4
7/8
1-1/8
leave the fa
actory, it will
s filled with n
nitrogen gas
ore connect t
the indoor u
g the copper
pipe with th
welding. Duri
ing welding,
el of unit.
Midea
a Precision AC
nto the pipe
eline for prot
size.
n height of u
unit pipeline
d add refrige
erant oil of u
ssor oil retu
rn, noise red
gn and cons
struction pro
r than 30m, o
or the vertic
berical show
ed in followi
omponents b
before instal
ition
gher than ind
door unit
wer than ind
door unit
5 meters of
the all vertic
ollowing tab
le are equiv
he installer w
will confirm w
Equiva
alent length (
Bend
45° B
Bend
0.2
21
0
0.1
0.2
24
0.
.12
0.2
27
0.
.15
0.
.3
0.
.18
0.4
44
0.
.24
0.5
56
0.3
0
has a smal
l amount of
s to stay the
pressure, a
unit and outd
door unit at s
he indoor an
nd outdoor u
pay attentio
on to do not
Technical Ma
anual-Down D
ection.
installation.
.
unit pipeline
installation.
duction and
vibration re
ocesses.
al height de
efference of
ng table, the
en it needs
lation.
Value
e
Max. 2
20m
Max. -5
5m
cal height tu
ubes.
alent length
, the friction
whether it is
s appropriate
(Meter)
T-sh
hape three-w
way
0.76
0.76
0.76
0.76
1.1
1.4
refrigerant i
in the indoor
nd must be
put off all th
site.
nit, pack the
e wet cloth o
burn the lab
bels near the
elivery Series
duction
indoor and
to confirm
n losses of
e according
r unit, the
hese
on the ball
e base pane
el
47
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents