Toshiba SD-22VB Service Manual page 42

Dvd video player & video cassette recorder
Hide thumbs Also See for SD-22VB:
Table of Contents

Advertisement

2-6: LOADING MOTOR/WORM (Refer to Fig. 2-6-A)
Remove the screw 1.
1.
2.
Remove the Loading Motor.
3.
Remove the Worm.
Main Chassis
• Screw Torque: 3 ± 0.5kgf•cm
NOTE
1.
In case of the Worm installation, check if the value of
the Fig. 2-6-B is correct.
2.
In case of the Loading Motor installation, hook the wire
on the Cassette Opener as shown Fig. 2-6-C.
3.
When installing the wires between Capstan DD Unit
and Loading Motor, connect them correctly as shown
Fig. 2-6-D.
Safety surface for pressing
of the insert.
Pink
Loading Motor
-
+
White
DISASSEMBLY INSTRUCTIONS
Loading Motor
Worm
1
Fig. 2-6-A
19.2 ± 0.1mm
Fig. 2-6-B
Loading Motor
Cassette Opener
Fig. 2-6-C
Capstan DD Unit
L2
L1
Fig. 2-6-D
2-7: TENSION ASS'Y (Refer to Fig. 2-7-B)
1.
Turn the Pinch Roller Cam clockwise so that the
Tension Holder hook is set to the position of Fig. 2-7-A
to move the Tension Arm Ass'y.
2.
Remove the Tension Spring.
Unlock the 2 supports 1 and remove the Tension
3.
Band.
Unlock the support 2 and remove the Tension Arm
4.
Ass'y.
Unlock the support 3 and remove the Tension
5.
Connect.
Float the hook 4 and turn it clockwise then remove the
6.
Tension Holder.
Tension Arm Ass'y
Tension Connect
Tension Spring
NOTE
1.
In case of the Tension Band installation, note the
direction of the installation. (Refer to Fig. 2-7-C)
2.
In case of the Tension Band installation, install correctly
as Fig. 2-7-D.
3.
In case of the Tension Connect installation, install as
the circled section of Fig. 2-7-E.
Tension Connect
[OK]
[NG]
Tension Connect
B2-2
1
1
Tension Band
3
Tension Arm Ass'y
Tension Holder
2
4
Tension Band
Tension Connect
Tension Band
Tension Connect
Tension Band
Main Chassis
Fig. 2-7-A
Fig. 2-7-B
Fig. 2-7-C
Fig. 2-7-D
Fig. 2-7-E

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sd-22veSd-22vl

Table of Contents