Toshiba SD-22VB Service Manual page 45

Dvd video player & video cassette recorder
Hide thumbs Also See for SD-22VB:
Table of Contents

Advertisement

2-14: CAPSTAN DD UNIT (Refer to Fig. 2-14-A)
1.
Remove the Capstan Belt.
Remove the 3 screws 1.
2.
3.
Remove the Capstan DD Unit.
1
• Screw Torque: 4 ± 0.5kgf•cm
NOTE
1.
In case of the Capstan DD Unit installation, apply the
silicon bond (TSE3843-W) on the position Fig. 2-14-B
correctly. (If no silicon bond applied, abnormal noise will
be heard on the deck operation.)
(Refer to Fig. 2-14-B, C)
Applied position of
silicon bond
Capstan DD Unit
DISASSEMBLY INSTRUCTIONS
Capstan Belt
Capstan DD Unit
1
1
Fig. 2-14-A
Be careful not to apply the silicon
bond to the Pinch Roller.
Fig. 2-14-B
Silicon Bond
Main Chassis
Fig. 2-14-C
2-15:
MAIN CAM/PINCH ROLLER CAM/JOINT GEAR
(Refer to Fig. 2-15-A)
Remove the E-Ring 1, then remove the Main Cam.
1.
Remove the E-Ring 2, then remove the Pinch Roller
2.
Cam and Joint Gear.
NOTE
1.
In case of the Pinch Roller Cam and Main Cam
installation, install them as the circled section of Fig. 2-
15-B so that the each markers are met. (Refer to Fig.
2-15-B)
Pinch Roller Cam
Marker
Main Cam
2-16: LOADING GEAR S/T UNIT (Refer to Fig. 2-16-A)
Remove the E-Ring 1 and remove the Main Loading
1.
Gear.
Remove the Main Rod, Tension Lever, Loading Arm S
2.
Unit and Loading Arm T Unit.
Main Rod
Tension Lever
B2-5
1
Main Cam
2
Pinch Roller Cam
Joint Gear
Fig. 2-15-A
Fig. 2-15-B
1
Main Loading Gear
Loading Arm T Unit
Loading Arm S Unit
Fig. 2-16-A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sd-22veSd-22vl

Table of Contents