8.7.
Main P.C.B.
1. Unlock the connector and remove the flexible cable.
2. Remove the 3 connectors.
3. Remove the 4 screws and remove the main P.C.B..
8.8.
Operation P.C.B.
1. Remove the connector.
2. Remove the 2 screws and remove the operation P.C.B.
8.9.
Monitor assembly
1. Unlock the connector and remove the flexible cable.
2. Remove the 2 screws.
3. Release the latches and remove the hinge cover.
4. Remove the screw and remove the monitor assembly.
13
DVD-LS90PP / DVD-LS93P