Quick Installation Guide DSN-6200/6500 Series 1GbE / 10 GbE IP SAN Storage This document will guide you through the basic installation process for your new D-Link DSN-6200/6500 series. DSN-6200/6500 series Documentation is also available on the D-Link website...
SAN is capable of handling heavy business production tasks with ease. Business value-added features such as 5. Use screws to mount the DSN-6200/6500 Series to application backup provide a complete backup solution the front side of the rack.
Drive Installation 1. Ensure the DSN-6200/6500 Series is powered off. 2. The BBM module is located inside the right PSU Note : Skip this section if you purchased a solution already (PSU2 module). Release the PSU2 latch and flip the installed with hard drives.
1. Click “Quick installation” and follow the steps to set 3. If you purchased the DSN-6200/6500 Series with a second controller (for redundancy) please install the up the system name and date / time. controllers as pictured below 2. Confirm the management port and DNS IP addresses are correct and click “Next”.