iv
OPERA TING MANUAL LOG OF REVISIONS
0
Air Conditioner
Airplane Performance.
7-11
Added
7-12
Added page.
8-1
Revised item 6.
ii
Added PAC Approval Form.
2-9a
l
2
6
AF/M
W/B
7-4
8-1
Added Applicability and Item III. ...
nii;u••'"
Pages Issued.
Added
l to
Rev. 2 to
AIRCRAFT DELIVERED WITH
MANUALS PRIOR TO THIS REVISION
DO NOT REQUIRE THIS REVISION.)
Added
footnote.
Added page (added material from page 2-8).
Relocated page (Alternator-Starter
Schematic).
Added page (Alternator-Starter Schematic).
Added Annunciator Panel information and
footnote.
Revised Instrument Panel illustration.
Added Seat Removal instructions.
Added Rev. 2 to Report: VB-558.
Added Rev. 3 to Report· VB-547.
Added Annunciator Panel check to Warm-
up and Ground Check; added footnote.
Revised item 6; added footnote.
Relocated material from page 8-1.
l
Need help?
Do you have a question about the CHEROKEE ARCHER and is the answer not in the manual?