Pentair CD-15G Installation And User Manual page 8

Intellizone commercial ozone generator
Table of Contents

Advertisement

6
AIR COMPRESSOR
FANS
HIGH VOLTAGE
POWER SUPPLIES
OXYGEN
CONCENTRATOR
VACUUM REGULATOR
& SOLENOID VALVE
OZONE CELL
ASSEMBLY
COOLING WATER OUT
COOLING WATER IN
INTELLIZONE™ COMMERCIAL OZONE GENERATOR Installation and User's Guide
DOOR SWITCH
COMPRESSOR
AIR FILTER
AIR INTAKE SCREENS (3)
Figure 6a: Component Locations
K3
K5
K1
K2
K4
Figure 6b: Connection Details for External Control Devices
HOUR METER
INDICATOR
LIGHTS
FLOW METER
VACUUM & PRESSURE
SWITCHES
BACK FLOW PREVENTER
& SOLENOID VALVE
OZONE OUT
Relay Panel
Remove jumper if ORP controller or dissolved
ozone monitor is used. Connect dry contact
leads from controller/monitor or leave open
if 5 pin external interface connector is used.
Remove jumper and connect dry contact leads
if external device is used. (ambient ozone, flow
switch, etc.)
RELAY PANEL
ON/OFF SWITCH
5 PIN EXTERNAL
INTERFACE
CONNECTOR
OPTIONAL
VARIABLE
OUTPUT SWITCH
RECEPTACLE
IEC 60320 C-14
CIRCUIT
BREAKERS (2)

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Cd-25g

Table of Contents