Operating Instructions - Edco DDG-9-I-0315 Operator's Instruction Manual

New single-disc floor grinder
Table of Contents

Advertisement

DDG-9-I-0315
• Read and understand all operating instructions before operating this equipment.
• Concrete grinders are designed to be used to grind flat horizontal concrete slabs using
• The machines are equipped with electric motors.
• They are designed to be controlled by a single operator from a position at the rear of the machine.
• When operating equipment maintain a safe distance from other personnel in the area.
BE SURE TO READ THE COMPLETE INSTRUCTIONS SUPPLIED WITH YOUR MACHINE
IMPORTANT: Perform Pre-Start Check
• Visually inspect the equipment for wear or damage.
• Be sure all guards are in place and functioning properly.
Do not operate unless all guards are in place and secure.
• Perform all daily maintenance.
• Inspect accessories - Be sure the correct accessory is installed properly on the machine,
mounting arrangement and its intended use.
• Check accessories for damage, the type of wear or damage will vary
with the type of accessory.
• Inspect work area to determine the presence and location of deck inserts, pipes, columns and objects
protruding from the slab surface so that they may be avoided during the grinding operation.
• FOR WET GRINDING: Attach the water supply. A flow rate of approximately
1/2 gallon per minute is recommended.
10
EQUIPMENT DEVELOPMENT COMPANY

OPERATING INSTRUCTIONS

Death or serious injury can result if this machine is used improperly.
EDCO approved accessories.
301-638-3326 • edcoinc.com • sales@edcoinc.com

Advertisement

Table of Contents
loading

Table of Contents