Download Print this page

Accucraft GWR 61XX PRAIRIE Operating Instruction

Tank locomotive

Advertisement

Quick Links

GWR 61XX PRAIRIE TANK LOCOMOTIVE No 6106
SAFETY FIRST
All our locomotives are safe to run, and will give many hours of pleasure,
providing the following safety procedures are followed: -
1.
Please read all the instructions thoroughly before running for the
first time.
2.
Never let the engine run out of water.
3.
When refilling the gas, do not have any naked flame present, and NO
SMOKING!
4.
Do not pick up the engine by the bodywork, chimney or boiler,
especially when hot.
5.
Only pick up the engine by the buffer beams and, when hot, use the
gloves provided or a cloth.
6.
Do not stand over the chimney. Ejected boiling water or steam may
cause serious injury.
7.
Do not open the smoke box door while the engine is alight.
8.
Constant supervision of the boiler water level is imperative as the gas
CAN outlast the water. Failure to do so will be treated as misuse and
is not covered by the warranty. The boiler will require topping up
about every 10 minutes.
9.
Failure to properly control the gas will result in over-heating the loco
and will cause damage to the mechanics and the paintwork and will
not be covered by warranty.
ACCUCRAFT UK LTD
Unit 8, Mynd Industrial Estate
Church Stretton, Shropshire.
SY6 6EA
Tel: 01694 723799
www.accucraft.uk.com
OPERATING INSTRUCTIONS

Advertisement

loading

Summary of Contents for Accucraft GWR 61XX PRAIRIE

  • Page 1 SY6 6EA Tel: 01694 723799 www.accucraft.uk.com OPERATING INSTRUCTIONS GWR 61XX PRAIRIE TANK LOCOMOTIVE No 6106 SAFETY FIRST All our locomotives are safe to run, and will give many hours of pleasure, providing the following safety procedures are followed: - Please read all the instructions thoroughly before running for the first time.
  • Page 2 General Hints As with all operating machinery, whether model or full size, wear will occur. In the model steam locomotive much can be done to help prolong its life and decrease the amount of time required in the workshop for servicing. Keep the engine as clean as possible, and the motion free from dirt and garden debris.
  • Page 3 The direction control is the lever forward of the nearside cab door. To operate push the lever gently inwards, and move to the desired direction. The control is “gated”, and will therefore hold itself in the full forward or reverse position. Preparation for Running The 6100 is fitted with a water gauge;...
  • Page 4 When the fire sound has stabilised, after about 30 seconds the gas can be turned up until a gentle burner sound is heard. The smoke box door may be shut after about two minutes. Now leave the locomotive to raise steam and let the locomotive raise at least 50 p.s.i.
  • Page 5 Continuous Running Running for longer periods of time than the normal, requires the use of the Boiler Filling System. This consists of a pump bottle with tube attached and a replacement boiler filler cap, which has a non-return valve on its underside. For the first fill service in the normal way.
  • Page 6 (cardboard) boxes and all the associated packaging when you purchase an Accucraft model and that if warranty work should be required the model is re-packed accordingly before our carriers collect it. Failure to do this will attract a charge for any repairs not covered by the warranty as well as the cost of any additional packaging to ensure a safe return.
  • Page 7 F. Allen keys and spare nuts and bolts (not normally required but included by the factory). The Accucraft GWR 61XX Tank Locomotive, Historical Notes. The Great Western Railway’s 61XX 2-6-2T design can trace its origins to Churchward’s ground-breaking family of designs produced at the start of the 20th century which included the large ‘prairie’...