Summary of Contents for Uponor Climate Control-Multifunction
Page 1
R A D I A N T H E AT I N G S Y S T E M S CLIMATE CO ˘ NTROL™ - MULTIFUNCTION INSTALLATION GUIDE Uponor Climate Co ˘ ntrol Multifunction Installation Guide...
Setting-up Primary Pump Functionality ..... . . 31 Uponor introduces Climate Co ˘ ntrol™ - Multifunction, the industry’s first Setting-up Mixing Functionality ......31 control systems platform that supports all functions required in today’s...
Climate Co ˘ ntrol - Multifunction system provides heat to melt snow and ice. If boiler protection is needed, the system will reduce the heat output of the snow-melt system. www.uponor-usa.com • www.uponor.ca Uponor Climate Co ˘ ntrol™ - Multifunction Installation Guide...
• Read the instructions. Do not make changes or modifications specified • High outdoor temperature limit — Snow melting is disabled when in this guide. Uponor is not responsible for damages and breakdowns the outdoor temperature exceeds a determined value.
Backplate for Main Control Main Controller Cover for Outputs (RJ45) Important: Read the following installation instructions prior to installing the display and main control. It will prevent any unnecessary rework. www.uponor-usa.com • www.uponor.ca Uponor Climate Co ˘ ntrol™ - Multifunction Installation Guide...
The display and main control are packaged as a single unit, assembled and 9. Use the access holes in the back of the pre-wired for operation. Uponor recommends mounting the main control panel to secure to the wall or surface.
The bottom four connectors are fully programmable outputs. When active, LEDs for the inputs and outputs will turn green. Figure 4-6 Figure 4-6 www.uponor-usa.com • www.uponor.ca Uponor Climate Co ˘ ntrol™ - Multifunction Installation Guide...
Port 8 Typical heating device (e.g., boiler) Figure 4-8: Typical wiring of four boiler stages Figure 4-7: Typical wiring of a heating device using an Uponor Boiler Control (A9012010) for space heating www.uponor-usa.com • www.uponor.ca Uponor Climate Co ˘ ntrol™ - Multifunction Installation Guide...
Figure 4-9: Typical wiring of a heating device using boiler control for space heating Input 8 Port 8 Figure 4-10: Typical wiring of a modulating valve in a mixing application using Uponor Modulating Valve Control (A9063020) www.uponor-usa.com • www.uponor.ca Uponor Climate Co ˘ ntrol™ - Multifunction Installation Guide...
Port 4 Input 4 The Climate Co ˘ ntrol - Multifunction unit supports variable speed injection mixing, which requires an Uponor Pump Relay Box (A9013030). (See Pump Manual Port 5 Input 5 Connections below for additional information on wiring.) Uponor promotes...
Page 12
Circulator or Circulator ( 2 amps Max ) ( 2 amps Max ) ( 2 amps Max ) Figure 4-13. Single- and double-gang electrical box with switch www.uponor-usa.com • www.uponor.ca Uponor Climate Co ˘ ntrol™ - Multifunction Installation Guide...
- Multifunction supports snow-melt operation through The Climate Co ˘ ntrol - Multifunction System supports automatic snow-melt the Uponor Snow Melt Control (A9013051). The Snow Melt Control, which operation when using Uponor Automatic Snow and Ice Sensor (A9013052). wires to the main control panel using a Cat5 cable and RJ45 ends for simple...
• The wiring compartments are enclosed. of the descriptions to indicate if that connection is wired. Use the section • The display is lit and showing the Uponor logo, default date and time provided for Programmed Output Ports in the same manner.
The date and time screen will automatically appear when the controller To adjust the display's backlighting to change the backlight settings, follow is turned on for the first time. Access this menu at: Uponor Screen > Settings this path: Uponor Screen > Settings > System Settings > Backlight >.
To view this information, follow this path: Uponor Screen > Information > Functions > Snow Melt > • Press or for the right setting, then press OK. [Channel Choice — only available if two zones of snow melt are set up.] •...
To view this information, This section helps the user understand this follow this path: Uponor Screen > Information > Functions > DHW >. control's full power and flexibility. (The use of the > symbol indicates pressing the OK button.)
To access the port assignment automatically start and manage the boiler. menu, follow this path: Uponor Screen > Settings > Ports > Port x (where x • Press or for the right setting, then press OK.
• Press or for the right setting, then press OK. • Using the keys, set the information correctly to match the system; then press OK to accept the information. www.uponor-usa.com • www.uponor.ca Uponor Climate Co ˘ ntrol™ - Multifunction Installation Guide...
To access the port assignment menu, follow this path: • Idle Enable — This setting indicates Uponor Screen > Settings > Ports > Port x (where x is any available port) > whether the slab or snow-melt area will Mix Device >.
Clear All Settings selection. Using this controller command will clear all port assignment. To access this setting, follow this path: Uponor Screen > Settings > Ports > Clear All Output light is on, • Output •...
Page 22
Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 USA Tel: (800) 321-4739 Fax: (952) 891-1409 Web: www.uponor-usa.com Uponor Ltd. 655 Park Street Regina, SK S4N 5N1 CANADA Tel: (888) 994-7726 Fax: (800) 638-9517 Web: www.uponor.ca...
Need help?
Do you have a question about the Climate Control-Multifunction and is the answer not in the manual?
Questions and answers