Base Station Installation
6
Finish
Chap. 4.5
Connect the wire
Power Box Installation
11
9
10
One-Time Setup
12
Turn Safety Switch ON
16
17
Set Lawn Size
Chap. 5.2.4
Press OK
7
Connect the Plot Connector
Chap. 4.6
13
Operating Panel
Chap. 5.2.1
Scroll
Choose / Confirm
Back / Cancel
Test Base Station Position
Chap. 5.2.5
Press OK
8
Insert 2 Pegs
Chap. 4.6
9
Chap. 4.6
Mount
Bracket
14
Choose Measurements Units
Chap. 5.2.2
Scroll
Meter
Celsius
24 Hours
15
Set Day & Time
Chap. 5.2.3
Possible Error
Messages:
Confirm steps 7,10,11
Swap wires in
plot connector
Reposition
Base Station
10
Chap. 4.7
Connect
15cm extension cable
11
Chap. 4.7
Foot
Fahrenheit
12 hours (AM / PM)
18
Peg Base
Chap. 5.2.5
Press OK
Need help?
Do you have a question about the RC Series and is the answer not in the manual?