Installing The Cooker Hood - Zanussi ZHT630 User Manual

Table of Contents

Advertisement

Please ensure that when the appliance is installed it
is easily accessible to an engineer in the event of a
breakdown.
All installations must comply with the local
authorities requirements for the discharge of
exhaust air.
Incorrect installation may affect the safety of this
cooker hood.
Installation Requirements
Before installation check the wall to which the
cooker hood is to be fitted for electric cables,
water pipes or gas.
If it is necessary to fix the hood to a hollow construction
plaster or partition board structure then it should be suffi-
ciently reinforced to be quite rigid in the area of the cooker
hood mounting brackets, and the appropriate rawl plugs
used for this type of fixing (not supplied).
Ducting
The ducting must be fire retardant 100mm (4ins) in dia-
meter and the length should be no more than:
3 metres with one 90° bend
2 metres with two 90° bends
Bends of more than 90° will reduce the
efficiency of the hood and reduce the airflow.
The clereance height between the inferior part
of the cooker hood and the hob must be 650
mm ( some models can be fitted at a lower
height from the hob, please refer to the installa-
tion paragraph).
Unpacking
The fittings supplied to install this cooker
hood can be found with the instruction book
inside the packaging and consists of the following:
Ducting spigot
Blanking plate
Wall / suspended fixing template

INSTALLING THE COOKER HOOD

12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents