Unpacking And Installing; Package Contents; Rack Mounting; Airflow - Streambox SBT3-9200 Product Manual

Hd/sd encoder/decoder
Table of Contents

Advertisement

3 Unpacking and Installing

3 UNPACKING AND INSTALLING
When removing the unit from its packaging, take note of
how the unit is packaged.
case there is a need to ship the product to another location
or to ship the unit to Streambox for repairs.
does not warranty products which are shipped without
original packaging materials.
includes 2 hardware units that must be connected and
configured.
The Streambox SBT3-9200 Encoder should be installed at
the video source location and the Decoder should be
installed at the receiving location.

3.1 Package Contents

Streambox SBT3-9200 Unit
Power Cord
Streambox SBT3-9200 Installation Manual
Streambox ACT-L3 HD/SD Transport Manual

3.2 Rack Mounting

The unit is designed to fit in a standard 1U height server
rack space.

Airflow

The unit draws cold air from the front and exhausts warm air
from the rear.
is not obstructed and cool air is available from the front of
the unit.
6
All packaging should be kept in
The unit should be mounted so that airflow
Streambox SBT3-9200 Installation Manual
The Streambox IFB solution
Streambox

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SBT3-9200 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents