Download Print this page

Miele PT 8303 SL EL Installations Plan page 12

Hide thumbs Also See for PT 8303 SL EL:

Advertisement

Air intake
Standard connection: Air intake from installation site
A sufficient supply of fresh air should be ensured to replace
the air extracted.
Alternative connection: Ducted air intake (from outside
building)
Lid removal exposes live components! For safety reasons,
the pipe connected for central air intake should be at least
900 mm (35 7/16") long and secured using two screws.
Fittings
Without base
2 × clamps
(supplied)
2 × screws DIN 571 (Ø × length)
2 × rawl plugs (Ø × length)
The machine should be bolted to the floor.
Fixing materials for a floating screed floor are to be provided
on site.
Machine data
Unit width
Machine depth
Unit height
Casing width
Casing depth
Minimum width of delivery access to installation site
Recommended rear wall gap (measured to front of machine)
Min. wall gap (to rear edge of lid)
Net weight
Dynamic floor load, max.
Average heat dissipation
(dependent on ambient room temperature and program
selected)
Sound pressure level
(measured at a distance of 1 m from the machine and at a
height of 1.6 m)1 m
Installation should only be carried out by authorized installers in accordance with valid regulations!
Follow installation instructions when installing machine! All rights reserved!
Installation plan: PT 8303
Date: Jan-2015
Min. air intake cross-section (to prevent draughts in room)
Connector on machine (int. diameter)
Connection pipe provided on site (ext. diameter)
83 in²
531 cm²
6 5/16"
161 mm
6 5/16"
160 mm
¼ x 1 9/16"
6 × 40 mm
3/8 x 2"
10 × 50 mm
28"
711 mm
42 13/16"
1088 mm
70 7/8"
1800 mm
27 7/8"
708 mm
39 5/16"
999 mm
28 9/16"
725 mm
59 1/16"
1500 mm
19 11/16"
500 mm
306 lbs
139 kg
1584 N
1584 N
1615 BTU/h
473 W
56 dB (A)
56 dB(A)
Page: 12

Advertisement

loading