Navien NHB-055 Installation & Operation Manual page 56

Condensing boiler
Hide thumbs Also See for NHB-055:
Table of Contents

Advertisement

2. On the slave boiler, press and hold the Diagnostic and Down(-
) buttons for more than 2 seconds. "SL.01" will appear on the
display to confirm that this boiler is set as a slave.
S
R
O/R
3. Repeat step 2 to configure the rest of the slave boilers in the
system.
4. On the master boiler, press and hold the Diagnostic and Up(+)
buttons for more than 5 seconds. All the display screens on the
configured boilers will return to the temperature display.
To add additional slaves at a later time, repeat step
Note
2.
To cancel the cascade communication setup, on the
master boiler, press and hold the Diagnostic and
Reset buttons for more than 5 seconds. The boilers
will revert to independent operation. Repeat steps
1-4 to reassign the master boiler.
56
Installing a Cascade System
S
R
O/R
psi
psi

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nhb-080Nhb-150Nhb-110Nhb seriesNhb-55Nhb-80

Table of Contents