Download Print this page

Navien NHB-55 Quick Installation Manual

Hide thumbs Also See for NHB-55:

Advertisement

Quick Links

STEP 1 Before Installing
Read the Installation & Operation Manual before
installing.
This product must be installed and serviced by a licensed
plumber, a licensed gas fitter, or a professional service
technician. Navien is not liable for any damages or defects
resulting from improper installation.
WARNING
Follow all local codes and/or the most recent edition of the National Fuel Gas Code
(ANSI Z223.1/NFPA 54) in the USA, or the Natural Gas and Propane Installation Code in
Canada (CAN/CGA B149.1).
Safety
DO NOT install the boiler in areas with excessively high humidity.
STEP 2 Installing
Unpacking
Mounting on the Wall
Do not install the boiler on dry walls without proper reinforcement.
Drill in the supplied anchor bolts
after considering where the vent
termination will be located.
Secure the mounting
bracket to the wall with
the tapping screws and
anchors.
Quick Installation Guide
Installation & Operation Manual
User's Information Manual
Vent terminators
Wall flanges
Spare Parts
Tapping screws and anchors
Wall mounting bracket
Air vent
Conversion Kit
Pressure Relief Valve (Heating)
Outdoor Temperature Sensor
and Cable
Air Vent Bushing (3/4" to 1/2")
CAUTION
Lift up the boiler, rest the unit on the hooks
provided on the wall bracket on the wall.
Then, install 2 fix screws through the bottom
bracket to secure the boiler to the wall.
Location Requirements
Select the best location on "Choosing an Installation" in the installation
Manual.
Allowable minimum clearances
Top
Side
Back
Side
Front
Bottom
Checking the Rating Plate
WARNING
• Before connecting the gas supply, determine the gas type and
pressure for the boiler by referring to the rating plate. Use only the
same gas type indicated on the rating plate. Using a different gas
type will result in abnormal combustion and malfunction of the
boiler. Gas supplies should be connected by a licensed professional
only.
• The appliance and its gas connection must be leak tested before
placing the appliance in operation.
• This boiler cannot be converted from natural gas to propane or vice
versa without a Navien gas conversion kit. Do not attempt a field
conversion of this boiler without a Navien gas conversion kit. Doing
so will result in dangerous operating conditions and will void the
warranty.
Navien America Inc. is not liable for any property damage and/or
personal injury resulting from improper conversions.
Removing the Front Cover
Remove the
4 screws
1
Model
NHB-055/080/110/150
Clearance Indoor Installation
Top
9 in (229 mm) minimum
Back
0.5 in (13 mm) minimum
Front
4 in (100 mm) minimum
Sides
3 in (76 mm) minimum
Bottom
12 in (300 mm) minimum
This boiler is configured for Natural Gas
from the factory. If conversion to Propane
Gas is required, the conversion kit supplied
with the boiler must be used.

Advertisement

loading

Summary of Contents for Navien NHB-55

  • Page 1 • This boiler cannot be converted from natural gas to propane or vice Pressure Relief Valve (Heating) versa without a Navien gas conversion kit. Do not attempt a field conversion of this boiler without a Navien gas conversion kit. Doing...
  • Page 2 Return You may install the pressure relief valve on the space heating supply of the Navien Manifold System, or on Air Bent Pressure the top connection along with the air vent (and an...
  • Page 3 Combustion Air Vent Exhaust Vent Piping Materials Venting Length • All Navien boilers are Category IV appliances. • The venting system should be approved for use with Category IV appliances (typically Type 3” pipe venting 2” pipe venting BH Special Gas Vent approved by UL 1738-S636).
  • Page 4 STEP 3 After Installing Opening All the Valves Gas Valve Space Heating System Valves Navien, Inc. 20 Goodyear, Irvine, CA 92618 Closed Open Tel: (949) 420-0420, Fax: (949) 420-0430 Shut-off Valves www.navien.com Drip rig Operating the Boiler Power ON Adjust Temperatures...

This manual is also suitable for:

Nhb-80Nhb-110Nhb-150