Weil-McLain 550 MBH Nstallation And Operation Manual page 37

Commercial condensing gas-fired water boilers
Hide thumbs Also See for 550 MBH:
Table of Contents

Advertisement

®
SlimFit
Series 3
DIRECT VENT — Boiler room air openings
MINIMUM combustion air openings for direct vent applications —
Provisions for combustion and ventilation air to be in accordance with the section "Air for Combustion and
Ventilation," of the National Fuel Gas Code, ANSI Z223.1/NFPA 54, or applicable provisions of the local building
codes.
Air openings
The required air opening sizes below are FREE AREA,
after reduction for louver obstruction. Note the ex-
ception below for large spaces.
Part number 550-100-168/0516
COMMERCIAL CONDENSING GAS
appliances in room
1
square inch per
of all other appliances in the room
1
square inch per
of all other appliances in the room
1
square inch per
of all other appliances in the room
1
square inch per
of all other appliances in the room
1
square inch per
of all other appliances in the room
1
square inch per
of all other appliances in the room
1
square inch per
of all other appliances in the room
A single combustion air opening can be used for cases ,
provided that:
The single opening must communicate directly to the outdoors or to a space that
communicates directly with outdoors (NOT to an interior space).
The top of the opening must be within 12 inches of the ceiling.
The free area of the opening must be at least equal to the sum of the areas of all
equipment vent connectors in the space.
NO combustion air openings are needed when the boiler (and other appliances) are installed
in a space with a volume NO LESS than 50 cubic feet per 1,000 Btuh of all appliances in
the space. That is, total the input of all appliances in MBH (1,000's of Btuh), then multiply
this total times 50. The building MUST NOT be of tight construction.
Example: For a total input of 1500 MBH (1,500,000 Btuh) and an 8-foot ceiling height,
the minimum volume would be 50 x 1500 x 8 = 60,000 cubic feet.
-
FIRED WATER BOILER
SlimFit boiler
WITH other
openings, each at least:
Btuh
openings, each at least:
Btuh
— OR —
opening **, each at least:
Btuh
openings, each at least:
Btuh
— OR —
opening **, each at least:
Btuh
openings, each at least:
Btuh
— OR —
opening **, each at least:
Btuh
Boiler Manual
(continued)
SlimFit boiler
WITHOUT other
appliances in room
openings are required if the
boiler installation provides at least the
Recommended service clearances
shown on page 6.
If the space is smaller, provide ONE
opening to a larger room with at least
1
square inch per
of SlimFit boiler input.
openings are required if the
boiler installation provides at least the
Recommended service clearances
shown on page 6.
If the space is smaller, provide ONE
opening to a larger room with at least
1
square inch per
of SlimFit boiler input.
openings are required if the
boiler installation provides at least the
Recommended service clearances
shown on page 6.
If the space is smaller, provide ONE
opening to a larger room with at least
1
square inch per
of SlimFit boiler input.
openings are required if the
boiler installation provides at least the
Recommended service clearances
shown on page 6.
If the space is smaller, provide ONE
opening to a larger room with at least
1
square inch per
of SlimFit boiler input.
or
above, sized as listed,
Btuh
Btuh
Btuh
Btuh
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

750 mbh

Table of Contents