Appliance Information; General Information - Worcester Greenstar Highflow 440CDi ERP Installation, Commissioning And Servicing Instructions

Floor standing rsf gas fired condensing combination boiler
Hide thumbs Also See for Greenstar Highflow 440CDi ERP:
Table of Contents

Advertisement

APPLIANCE INFORMATION

2
APPLIANCE INFORMATION
2.1

General information

BOILER FEATURES AND CHECKLIST
• Pre-wired and pre-plumbed
• Galvanised steel inner frame
• Digital control system
• Sense II Intelligent controls
• Automatic ignition
• Direct burner ignition electrodes
• Built-in frost protection
• Built-in fault finding diagnostics
• Modulating automatic gas valve
• Combustion air fan with speed regulator
• CH temperature sensor and control
• Pump anti-seizure protection
• Flue gas temperature sensor
• Condensate trap and pump
• DHW flow sensor and temperature control
• Plate type DHW heat exchanger
CHECK LIST
- LITERATURE PACK:
ErP
Greenstar 440CDi
& 550CDi
Commissioning and Servicing Instructions
Users Instructions
Table 4 Literature pack - checklist
CHECK LIST
- HARDWARE PACK:
Sealing Pack:
- Compression Nut 22mm
- Compression Ring 22mm
- Seal 23.9 x 17.2 x 1.5
- Bonded Washer
Hose terminal connector
Condensate outlet adapter
Condensate hose clips
Condensate hose clip
Sheet metal screw
Table 5 Installation pack - checklist
6
Qty.
ErP
Installation,
1
1
Qty.
1
5
5
4
1
1
1
4
1
1
STANDARD PACKAGE:
m m
1
6 0 0
2
3
4
6
Fig. 1
Standard package
[1]
Floor standing gas fired combination boiler for central heating
and domestic hot water.
[2]
Mounting frame complete with pre-plumbing manifold assembly.
[3]
Literature pack.
[4]
Hardware pack.
[5]
Condensate waste pipe and non-return valve.
[6]
ErP energy label
Greenstar Highflow CDi
6 0 0 m
m
850mm
5
ErP
- 6720818077 (2016/04)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar highflow550cdi erp

Table of Contents