Installation; Unpacking The Boiler - Worcester Greenstar Highflow 440CDi ERP Installation, Commissioning And Servicing Instructions

Floor standing rsf gas fired condensing combination boiler
Hide thumbs Also See for Greenstar Highflow 440CDi ERP:
Table of Contents

Advertisement

INSTALLATION

4
INSTALLATION
CAUTION: ROOF SPACE
▶ THIS BOILER IS NOT SUITABLE FOR ROOF SPACE
INSTALLATION.
NOTICE: Boiler start up
▶ All the previous Pre-Installation sections must be
read and requirements met before starting boiler or
flue installation.
4.1

Unpacking the boiler

NOTICE: BOILER HANDLING
▶ The correct method for handling heavy objects
should be strictly observed, at all times.
▶ Take care not to damage the boiler panels or the
floor.
▶ The boiler may contain some water due to factory
testing
▶ Store the boiler in a dry area prior to installation
Unpacking:
▶ Undo the ties securing the carton to the pallet.
If a sharp implement is used, care must be taken not to pierce the
carton or cause injury.
▶ Before removing the carton it is advised that the top flaps are opened
and the ancillary items [1, 2, 3, 4 & 5] are removed and set to one
side.
▶ The carton can now be lifted off the boiler.
▶ Remove the plastic bag protecting the boiler surfaces and place
safely away from the working area.
▶ Grip the outer sides of the front panel, pull towards you to release the
ball catches and lift away from retaining lugs.
▶ Remove the front retaining screw securing the boiler to the pallet.
▶ Remove the rear retaining screw securing the boiler to the pallet.
▶ The boiler is mounted on small wheels and two people are
recommended to move the boiler from the pallet taking care not to
damage the panels or the floor.
▶ Slide the boiler off the pallet.
▶ Pull the plastic strip plug [6] down to remove from the boiler pipe
work.
GENERAL HANDLING GUIDELINES:
▶ Lift only a manageable weight, or ask for help.
▶ When lifting, bend the knees, and keep the back straight and feet
apart.
▶ Do not lift and twist at the same time. Lift and carry items close to the
body
▶ Wear protective clothing and gloves to protect from any sharp edges
20
Fig. 18 Unpacking
[1]
Mounting frame
[2]
Installation pack
[3]
Literature pack
[4]
Condensate waste pipe and non-return valve
[5]
ErP energy label
[6]
Transit bung
Greenstar Highflow CDi
1
3
2
4
5
6
ErP
- 6720818077 (2016/04)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar highflow550cdi erp

Table of Contents