Installation Summary; Unpacking The Catalyst 3920 - Cisco Catalyst 3920 Installation Manual

Hide thumbs Also See for Catalyst 3920:
Table of Contents

Advertisement

Installation Summary

Dedicated Media
For installations where permanently installed building cable is available, 100-ohm UTP Category 3,
4, or 5 can be used. IBM Cabling System 150-ohm, STP cables (types 1 and 9) can also be used.
Because the RJ-45 connectors on the Catalyst 3920 use pins 3, 4, 5, and 6, a cable with an IBM STP
data connector on one end and an RJ-45 connector on the other must be constructed.
Shared Media
The types of cables that can be used are the same as those described above for dedicated-media
segments. The acceptable distances are defined by the hub or concentrator attached to the
Catalyst 3920 port.
Installation Summary
The basic installation steps are as follows:

Unpacking the Catalyst 3920

Gathering Other Materials You Will Need
Setting Up the Catalyst 3920
Cabling the Catalyst 3920
Cabling a Catalyst Stack Configuration
Powering On the Catalyst 3920
Unpacking the Catalyst 3920
To unpack the Catalyst 3920, follow these steps:
Step 1
Step 2
Step 3
Step 4
3-2
Catalyst 3920 Token Ring Switch User Guide
Open the carton. Along with the Catalyst 3920 Token Ring Switch User Guide, the
package should contain:
Catalyst 3920
Power cord
Accessory kit (includes the manual, rack mounting brackets and screws, surface
mounting chassis feet, and electrostatic wrist strap)
If any item is missing or damaged, contact your Cisco Systems representative.
Remove the power cord and bag containing the accessory kit.
Remove the Catalyst 3920 from its protective packaging.
Visually inspect the Catalyst 3920 to ensure that it was not damaged during shipment.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents