O-E42/E50/E83/E110; E69 - Pentax 67 II Service Manual

Hide thumbs Also See for 67 II:
Table of Contents

Advertisement

8.5
O-E42
(Isl
curtain pipe),
ESO
(Curtain
roller
A),
E83
(Curtain
shaft wheel),
EllO
(Curtain shaft
pedestal)
1)
Apply appropria1e
quan1i1y
of L3 l oil
1o
shaf1 sec1ion of 0-E42,
push down
shaft and
apply
appropria1e
quan1i1y
of L1 I oil.
Move shaft section
up
and
down
and spread U
I.
2)
lusnt
F58
into
O-E42
~haft
section and attach
to
El
IO.
Fix
with
screwdriver and attach
ES~.
O-E63
8.6 E69
(Shaft
plate C)
1)
Insert
into
O-E42 in the
order
W8 t=O.l
(-adj.),
ESO.
Align with shaft sections of O-E42
and
O-E43,
attach
E69,
insert W81=0.2
(-adj.),
and
fasten with
LW20.
2.
Apply appropriate quantity
of
L31 oil from side
of
LW20 attachment section to hole
section
of
E69
bearing.
E69 installing direction
~r--W8
t=0.2(-adj.)
~LW20
~
-
I
27:340
59170

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents