O-E91/E95/T100; T100/O-J201 Soldering; Check: Shutter Curtain Operation - Pentax 67 II Service Manual

Hide thumbs Also See for 67 II:
Table of Contents

Advertisement

6.32.4 O-E91 (Duality prevention lever assy.), E95 (Duality prevention lever spring),
TlOO
(S300 part)
1)
lnstall
E95, O-E91 on
sliaf1 of
O-E67
and fastcn with
CNL-F
l.4 x2.5.
2) Attach E95 spring
to
E96
aud O-E91
as shown
iu drawing.
3) Apply G-21 all
rouud
O-E67.
4) luscrt tip of l-E91 into
annature
part of S300 and fasten S300 part ofTlOO to mirror box with
CNL-D
1.7 x3.5.
6.32.5 TlOO (1'301 part), O-J201 (Light sensor) soldering
1) Solder lead wires to TlOO
from KlOl.
Black, Blue, Brown
2) Solder 0-1201 (Light sensor)
and
TlOO flex.
2 soldering lands
3) Solder 1230 (X
contact)
and TlOO flex.
a soldering land
4) Treat lead wires (black, brown, blue)
under Tl 00
flex.
6.33 Check: Shutter curtain operation
[Tools] 95901-Kl 65 (23400K-E80-A)
NB: Owing to large diameter of bead
of
E79
(Selector
shaft nut), inside of 23400K-E80-A
should
be shaved
with a file.
1)
Check
alignment and parallelism of
curtains.
Standard :
Curtain
alignment :
gap
max. 0.1 mm
Overlapping: max.
0.3111111,
Slant: max. 0.3 mm
2)
2nd curtain drive-in amount
Standard:
52170
On the inside mark-in line to
two mark-in line.
27340
Check point
:
*Curtain alignment
*Overlapping
*Running-in
I
wound upl
Check point
*Parallel
*Slant
I
Mid. of Wound up
I

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents