B21, B22 X2; O-B36/B41/B42/B43 - Pentax 67 II Service Manual

Hide thumbs Also See for 67 II:
Table of Contents

Advertisement

6.32.2 B21 (Focus
screen SW
contact), Il22 (Focus screen S\V pin) x2
1)
Bend Tl 00 along fold from bottom surface of
mirror box
and
install in
side.
2) Wipe TIOO
lands
and B21 contact with
cleaning liquid.
3)
Insert
B22 x2
into
body,
mount
B21 and
fasten with
CN L-D 1.7 x2.0 x2.
4)
B21 should
be off when
B22 x2
is pushed from inside
body.
5)
Combine
T3011lex
with TIOO and
fasten with
CNL-D
1.7
x2.0.
6)
Solder
9
lands.
(TOO
-
O-T301)
---i
0
0
DD
Soldering
6.32.3 O-B36 (Lock-pin guide assy.), B41
(AM
SW collar), B42
(AM
SW), B43
(AM
SW spring)
1)
Insert
O-B36 (included B39)
into the mirror box
and fasten with CNL-D
1.7
x3.5.
2) Check
the function
of
the Mount lock lever.
3)
Wipe AM SW land
ofTlOO and B42 contact,
and install
B42 and B41
into mirror box
and fasten
with
CNL-D 1.7 x4.5.
4) Install
B43
and
attach spring
to
B42 and
mirror box.
NB
: Bend contact of B42
from V notch and remove.
(When
using new items)
27:
3 10
CHL-D1.7x4.5
~
~843
/@
841
51170

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents