Maintenance; Recommended Maintenance Schedule - Toro 30299TE Operator's Manual

Mid–size mower proline t–bar hydro 15hp with 112 cm side discharge mower
Table of Contents

Advertisement

Maintenance

Note: Determine the left and right sides of the machine from the normal operating position.

Recommended Maintenance Schedule

Maintenance Service
Interval
Each Use
After first 8 Hours
8 Hours
25 Hours
50 Hours
100 Hours
200 Hours
At storage
1
More often in dusty, dirty conditions.
Important
Refer to your engine operator's manual for additional maintenance procedures.
Maintenance Procedure
• Engine oil—check level
• Safety System—check
• Battery electrolyte—check
• Cooling system—clean
• Mower housing—clean
• Engine oil—change
• Hydraulic filter—change
• Battery electrolyte—check
• Hydraulic fluid—check
• Mower housing—clean
• Cutting Blades—check
• Blade Spindle Bearings—grease
• Foam Air Cleaner—service
• PTO Belt Idler Arm—grease
• Caster Wheels—grease
• Tires—check pressure
• Belts—check for wear/cracks
1
• Engine oil—change
• Electric Clutch—adjust
• Hydraulic lines—check
• Paper Air Cleaner—replace
• Cooling system—clean
• Oil Filter—change (200 hours or every other oil change)
• Fuel Filter—replace
• Spark Plug(s)—check
• Hydraulic oil filter—change
• Chipped Surfaces—paint
• Perform all maintenance procedures listed above before storage
24
1
1

Advertisement

Table of Contents
loading

Table of Contents