Installation Location Check List - Carrier 53KHRT 12-18-24 Crystal Installation Manual

Hi wall split air conditioners
Table of Contents

Advertisement

10. INSTALLATION LOCATION CHECK LIST

(A) INDOOR UNIT
- The installation location is close to the outdoor unit
- The wall hole (required to pass refrigerant piping, electrical cables and drain line)
is properly made as per installation required.
- The installation location permit the unit to deliver air to all of the space
to be air-conditioned
- The installation location is far away from any sunlight
- The installation location is far away from any heat sources
- The installation location avoid obstructions, which affect motion of supply and/or
return air to the unit
- The installation location permit free service space around the unit right, left, front
back and top
(B) OUTDOOR UNIT
- The electrical power supply is close to the outdoor unit
- The installation location is close to the indoor unit
- The installation location is able to support operating weight of outdoor unit
- The installation location is far away from any sunlight
- The installation location is free of dust or any material,
which can cause clogging of outdoor coil
- The installation location allow sufficient space
for air circulation around the unit
- The installation location allow sufficient space
for service and maintenance around the unit
- The installation location is selected so that the operation
noise and discharge air do not disturb the neighbors
(C) REFRIGERANT PIPING LINES BETWEEN INDOOR AND OUTDOOR UNITS
- The excessive length of refrigerant piping lines is avoided
- The excessive height between indoor and outdoor units is avoided
- The excessive number of turns and bends in the refrigerant piping lines is avoided
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents