Panasonic NN-E205WB BPQ Service Manual page 19

Table of Contents

Advertisement

COMPONENTS
MAIN FUSE
TEST PROCEDURE
Check for continuity of the fuse with an
multi-meter.
NOTE: If the fuse is blown, check the primary, the secondary, and the monitor
switches, H.V.D. and H.V.C. before replacing the fuse.
If the fuse is blown by improper switch operation replace the defective switch
and the fuse at the same time. Replace just the fuse if the switches operate
normally.
5-10
RESULTS
Normal
Abnormal

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents