Teaching-in
6
t
eachIng
In order to integrate the MAX! Boiler Controller into a MAX!
system it has to be connected to the MAX! Cube via the MAX!
software first. All settings and programming (e.g. week pro-
grams) can be done via the MAX! software afterwards.
You have to teach-in the two channels (MAX! Central heating
and MAX! Hot water) separately.
•
Start the local MAX! software and click on "New device".
•
Press and hold down the first channel button (B) of the
MAX! Boiler Controller for at least 3 seconds to activate
teach-in mode. The channel LED will start flashing green.
1.
•
The first channel will appear in the software.
•
Press and hold down the second channel button (D) of the
MAX! Boiler Controller to activate teach-in mode of the
second channel.
•
The second channel will appear in the software as well.
•
Click on "Next" in the software to give the device a name
and assign it to a room.
•
The MAX! Boiler Controller is now integrated into the
system and can be configured for each room via the MAX!
software or the smartphone app.
14
-
In
2.
> 3 s