Lenovo TAB 2 A10-30 Hardware Maintenance Manual
4. Remove the conductive fabric tape as shown in the figure below.
5. Remove screws
Part No. Screw (quantity)
60
Figure 9-4. Removing the conductive fabric tape
a
on the sub board.
Figure 9-5. The screws on the sub board
a
M1.4 × 3.5
Color
Torque
Black
N/A