Huawei S2700 Series Quick Start Manual page 21

Hide thumbs Also See for S2700 Series:
Table of Contents

Advertisement

S2700&S3700&S5700&S6700 Series Ethernet Switches
Quick Start Guide
1.
2.
Issue 12 (2013-07-25)
Install mounting ears. If guide rails have been installed in the cabinet, rear mounting ears
are not required and you only need to install front mounting ears or cable management
frames. If guide rails have not been installed, install rear mounting ears and front mounting
ears or cable management frames according to A and B in the following figure. Choose to
install front mounting ears or cable management according to your needs.
A
B
Install floating nuts.
l Install four floating nuts on the front mounting rails, two on each side. There must be
an interval of 2 U between the two floating nuts on each front mounting rail, as shown
in the following figure.
l Install four floating nuts on the rear mounting rails, two on each side. There must be an
interval of 1 U between the two floating nuts on each rear mounting rail, as shown in
the following figure.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Device Installation
M4
M4
16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S3700 seriesS5700 seriesS6700 series

Table of Contents