General; Go/No Go Testing; Test Set-Up Go/No Go Test - Sony Ericsson K750i Installation Instruction, Electrical

Hide thumbs Also See for K750i:
Table of Contents

Advertisement

1 General

The Electrical Installation Instructions describes the procedures for installing all of the
hardware and software needed to perform testing, calibration, software loading and repair
activities at an Electrical level for the Sony Ericsson products specified.
NOTE!
During electrical repair, it is critical to make sure that no lead is introduced into the product.
For this reason, certain repair materials and equipment must be designated as lead-free and
labelled accordingly. A lead-free work area must be setup that is completely separated from
work areas that are used to make leaded repairs. Certain items must be designated for lead-
free work only. Some of the items that need to be clearly labelled in this way are listed in the
Equipment List Electrical. Note that any item that contacts the solder must be labelled and
used for lead-free work only.

2 Go/No Go Testing

There are two options for performing a Go No/Go test. One is to use an RF Fixture and the
other is to use an antenna coupler together with a shielding box.
2.1

Test Set-up Go/No Go test

All test hardware necessary for this test set up is documented in the Electrical Equipment List.
1/00021-2/FEA 209 544/94 B
©
Company Internal
Sony Ericsson Mobile Communications AB
This product is manufactured with lead-free solder and lead-free components.
Installation Instruction, Electrical
2(9)

Advertisement

Table of Contents
loading

This manual is also suitable for:

K750c

Table of Contents