Mitsubishi Electric PUHZ-SHW HA Series Installation Manual page 7

Air-conditioners / air to water heat pump
Hide thumbs Also See for PUHZ-SHW HA Series:
Table of Contents

Advertisement

Available languages

Available languages

4. Installing the refrigerant piping
A
C
D
E
F
G
A Stop valve <Liquid side>
B Stop valve <Gas side>
C Service port
D Open/Close section
E Local pipe
Fig. 4-5
(1)
Fig. 4-6
A Valve
I Double spanner section
B Unit side
(Do not apply a spanner other than to this section.
C Handle
Doing so would cause coolant leaks.)
D Cap
J Seal section
E Local pipe side
(Seal the end of the heat insulation material at the
F Pipe cover
pipe connection section with whatever seal mate-
G Service port
rial you have on hand so that water does not infi l-
H Wrench hole
trate the heat insulation material.)
B
C
Fig. 4-8
4.6. Addition of refrigerant
• Additional charging is not necessary if the pipe length does not exceed 30 m.
• If the pipe length exceeds 30 m, charge the unit with additional R410A refrigerant
according to the permitted pipe lengths in the chart below.
* When the unit is stopped, charge the unit with the additional refrigerant through
the liquid stop valve after the pipe extensions and indoor unit have been vacu-
umized.
When the unit is operating, add refrigerant to the gas check valve using a
safety charger. Do not add liquid refrigerant directly to the check valve.
Permitted pipe
Model
length
SHW80, 112, 140
2 m - 75 m
Permitted pipe
Model
length
SHW230
2 m - 80 m
B
H
I
F Sealed, same way for gas side
G Pipe cover
H Do not use a wrench here.
Refrigerant leakage may result.
I Use 2 wrenches here.
(2)
Fig. 4-7
* The fi gure to the left is an example only.
A
The stop valve shape, service port position,
etc., may vary according to the model.
* Turn section A only.
(Do not further tighten sections A and B
together.)
D
C Charge hose
D Service port
Permitted vertical
difference
31 - 40 m
Max. 30 m
0.6 kg
Permitted vertical
difference
31 - 40 m
Max. 30 m
1.2 kg
4.4. Refrigerant pipe airtight testing method (Fig.4-5)
(1) Connect the testing tools.
• Make sure the stop valves A B are closed and do not open them.
• Add pressure to the refrigerant lines through the service port C of the liquid
stop valve A .
(2) Do not add pressure to the specifi ed pressure all at once; add pressure little by
little.
1 Pressurize to 0.5 MPa (5 kgf/cm
sure does not decrease.
2 Pressurize to 1.5 MPa (15 kgf/cm
sure does not decrease.
3 Pressurize to 4.15 MPa (41.5 kgf/cm
perature and refrigerant pressure.
(3) If the specifi ed pressure holds for about 1 day and does not decrease, the pipes
have passed the test and there are no leaks.
• If the surrounding temperature changes by 1°C, the pressure will change by
about 0.01 MPa (0.1 kgf/cm
G). Make the necessary corrections.
2
(4) If the pressure decreases in steps (2) or (3), there is a gas leak. Look for the
source of the gas leak.
4.5. Stop valve opening method
The stop valve opening method varies according to the outdoor unit model. Use the
appropriate method to open the stop valves.
(1) Gas side (Fig. 4-6)
1 Remove the cap, pull the handle toward you and rotate 1/4 turn in a counterclock-
wise direction to open.
2 Make sure that the stop valve is open completely, push in the handle and rotate
the cap back to its original position.
(2) Liquid side (Fig. 4-7)
1 Remove the cap and turn the valve rod counterclockwise as far as it will go with
the use of a 4 mm hexagonal wrench. Stop turning when it hits the stopper.
(ø9.52: Approximately 10 revolutions)
2 Make sure that the stop valve is open completely, push in the handle and rotate
the cap back to its original position.
Refrigerant pipes are protectively wrapped
• The pipes can be protectively wrapped up to a diameter of ø90 before or after
connecting the pipes. Cut out the knockout in the pipe cover following the groove
and wrap the pipes.
Pipe inlet gap
• Use putty or sealant to seal the pipe inlet around the pipes so that no gaps remain.
(If the gaps are not closed, noise may be emitted or water and dust will enter the
unit and breakdown may result.)
Precautions when using the charge valve (Fig.4-8)
Do not tighten the service port too much when installing it, otherwise, the valve core
could be deformed and become loose, causing a gas leak.
After positioning section B in the desired direction, turn section A only and tighten it.
Do not further tighten sections A and B together after tightening section A.
Warning:
When installing the unit, securely connect the refrigerant pipes before starting
the compressor.
* After charging the unit with refrigerant, note the added refrigerant amount on
the service label (attached to the unit).
Refer to the "1.5. Using R410A refrigerant outdoor unit" for more information.
• Be careful when installing multiple units. Connecting to an incorrect indoor unit
can lead to abnormally high pressure and have a serious effect on operation
performance.
Additional refrigerant charging amount
41 - 50 m
51 - 60 m
1.2 kg
1.8 kg
Additional refrigerant charging amount
41 - 50 m
51 - 60 m
2.4 kg
3.6 kg
G), wait 5 minutes, and make sure the pres-
2
G), wait 5 minutes, and make sure the pres-
2
G) and measure the surrounding tem-
2
61 - 75 m
2.4 kg
61 - 70 m
71 - 80 m
4.8 kg
5.2 kg
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Puhz-shw ka series

Table of Contents