Venting Instructions - Dunkirk DCC-150 Installation, Operation & Maintenance Manual

Hide thumbs Also See for DCC-150:
Table of Contents

Advertisement

Available languages

Available languages

4.1

VENTING INSTRUCTIONS

4.1.1
Concentric venting
• Examine all components for possible shipping damage, prior to installation.
• This venting system must be free to expand and contract.
• The venting system must be supported in accordance with these instructions.
• The vent system must have unrestricted movement through walls, ceilings and roof penetrations.
• Check for proper joint construction when joining pipe to fittings.
• If venting is penetrating ceilings and floors, the openings must have firestopping provided in joist areas and the installation of
firestop spacer assemblies.
• Roof flashing parts are shown in the manual. Standard roof flashing methods must be employed to install the roof flashing.
• Wall and roof openings must be framed to provide support and the attachment of termination assemblies.
Please Note:
The manual uses the terms 'vent' , 'venting' and 'flue' interchangeably. A ll references t o ' flue' ar e sy nonymous wi th 'v ent' or
'venting'.
WARNING
Check all measurements before cutting. Clearance to combustible materials when using a concentric vent system is
zero.
NOTICE
All concentric venting must be fastened together using screws.
Note: Dual flue venting is not to be fastened with screws. This procedure only pertains to concentric venting.
17
x
Y
240011373, REV D (05/02/16)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dcb-125

Table of Contents