Tools For Installation; Installation Preparation - New Buck Corporation 20 Room Heater Installation And Operation Manual

Buck stove room heater
Table of Contents

Advertisement

Close clearance installations using listed Close Clearance pipe and 2100
manufacturer's list. (See page 18)
12"
FIGURE 3
WALL INSTALLATION

TOOLS FOR INSTALLATION

Drop Cloth
Electric Drill with 3/32" drill bit
5/16" combination wrench
5/16" magnetic socket chuck adapter, 5/16" wrench (box or socket) or adjustable wrench
Socket Set
Tape Measure
Pencil
Level
PREPARING THE STOVE FOR INSTALLATION
1. Inspect the unit for any obvious physical damage.
2. Plug the power cord into a 115V AC outlet. Set switch to "Manual" and rheostat to "High" position to ensure
motor operates properly.
3. Check the primary air draft control to ensure that it operates freely.
4. Check the operation of the bypass damper control to ensure that it will open and close properly.
5. Remove any items from within the firebox. Spread the drop cloth on the floor behind the heater. Next, tilt the
heater so that the back is on the drop cloth.
6. Using a tape measure, make a line down 3" from the front of the heater.
7. Open the corresponding freestanding kit and obtain the stand. Place the stand against the bottom of the heater
(angle side to heater) at the marked line. Center the stand left and right and mark screw locations on bottom
through outer holes of stand mounting angles. Set stand aside and drill four 3/32" holes in heater bottom.
8. Obtain four 3/16" self-tapping screws and secure the stand to the heater.
9. Reposition the heater to the upright position.
o
HT chimney system from approved
FIGURE 4
CORNER INSTALLATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Buck stove 20

Table of Contents