LG KB-14P2B Service Manual page 60

Hide thumbs Also See for KB-14P2B:
Table of Contents

Advertisement

MAINTENANCE/INSPECTION PROCEDURE
5-2) Greasing
(1) Greasing guidelines
Apply grease, with a cleaning patch. Do not use excess
grease. It may come into contact with the tape transport
or drive system. Wipe any excess and clean with clean
ing patch wetted in Isopropyl Alcohol.
NOTE:Greasing Points
1) Loading Path Inside & Top side
2) Base Tension Boss inside Hole
3) Arm Assembly F/L "U" Groove
4) Arm Take-up Rubbing Section
5) L/D Motor Worm Wheel Part
1
2
3
Chassis (Top)
Gear Part
Gear Sector
Press
Gear Assembly Up/D Gear Drive
Stopper Part
Guide Rail
Bracket Side (L)
4-25
6) Shaft
7) Arm Assembly F/L of Buming
Inside Hole
8) Reel S, T Shaft (G381:Yellow)
9) Brake T Groove
4
5
6
9
7
8
Cam Part
Gear Cam
Cam Part
Bracket Assembly Door
(2) Periodic greasing
Grease specified locations every 5,000 hours.
1) Loading Path Inside & Top side
2) Shaft
3) Gear Rack F/L Moving Section
4) Shaft
2
3
Chassis (Bottom)
Side
Bottom
Guide Rack F/L
Cam Part
Plate Slider (Top)
Cam Part
Plate Slider (Bottom)
5) Lever Tension Groove
6) Clutch Assembly D33 Shaft
7) Brake "S" Rubbing Section
1
4
5
6
7
Bottom
inside
Cam &
Gear Part
Gear Rack F/L
Gear Part

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents