LG KB-14P2B Service Manual page 42

Hide thumbs Also See for KB-14P2B:
Table of Contents

Advertisement

DECK MECHANISM DISASSEMBLY
Spring Tension
(Fig. A-4-3)
11. Brake Assembly S (Fig. A-4-1)
1) Remove the Spring S Brake.
2) Hold the (A) part shown above Fig. A-4-1 and turn to the
clockwise direction, and then lift up the Brake Assembly S.
NOTE
(1) When reassembling, be careful not to change the Spring
with below No.12.(Refer to Fig. B-2).
12. Brake Assembly T (Fig. A-4-2)
1) Remove the Spring T Brake.
2) Hold the (B) part shown above Fig. A-4-2 and turn to the
counterclockwise direction, and then lift up the Brake
Assembly T.
NOTE
(1) When reassembling, be careful not to change the Spring
with above No.11.(Refer to Fig. B-2).
(Difference for Springs)
Spring T Brake
Spring S Brake
Spring Tension
4-7
Spring S Brake
(A)
Arm Assembly
Tension
(C)
Band
Assembly
Tension
Reel S
(Fig. A-4-4)
(For Jog Shuttle Models)
Fig. A-4
(Fig. B-2)
Color (Black)
Brake Assembly S
(Fig. A-4-1)
Reel T
(Fig. A-4-5)
Spring T Brake
Brake Assembly T
13. Arm Assembly Tension (Fig. A-4-3)
1) Remove the Spring Tension.
2) Hold the (C) part shown above Fig. A-4-3 and turn to the clock-
wise direction, and then lift up the Arm Assembly Tension.
NOTE
(1) When reassembling, be careful not to change the Spring
with above No.11,12.(Refer to Fig. B-2).
14. Reel S (Fig. A-4-4) & Reel T (Fig. A-4-5)
1) Lift up the Reel S and Reel T.
NOTE
(1) When reassembling, be careful not to change the Reel S
and Reel T each other.
Reel S
(2) Confirm two Slide Washers under the Reel S and Reel T.
B
(Fig. A-4-2)
Three Holes
Reel T

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents