LG KB-14P2B Service Manual page 41

Hide thumbs Also See for KB-14P2B:
Table of Contents

Advertisement

DECK MECHANISM DISASSEMBLY
( H1)
Head F/E
NOTE
(1) Place the Spring Lever S/W of the above (No.1) as
original position.
(H5)
(Fig. A-3-2)
(For Jog Shuttle Models)
Spring
Lever S/W
(H5)
Arm Assembly
Cleaner
(A)
(Fig. A-3-1)
(S5)
(Fig. A-3-3)
Fig. A-3
8. Arm Assembly Cleaner(Fig. A-3-1)
1) Break away the (A) part shown above Fig. A-3-1 from the
Embossing of the Chassis in the clockwise direction and
lift up the Arm Assembly Cleaner.
9. Head F/E (Fig. A-3-2)
1) Unhook the two Hooks (H1) on the back side of the
Chassis and lift up the Head F/E.
10. Base Assembly A/C Head (Fig. A-3-3)
1) Remove the Screw (S5) and lift up the Base Assembly
A/C Head.
Base Assembly A/C Head
4-6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents