Examination before commissioning

After the machine is unpacked and before commissioning it must be examined for damage in
transit.
In cases of damage, be sure to inform both the forwarding agent and the PFAFF agency
responsible.
4

Setting up the machine

Set up the machine horizontally at its intended location
On newly commissioned machines or on machines which have not been used for a
long timebe sure to check the hook oil supply (see chapter 8.4).
5

Compressed air and electrical connection

5.1

Compressed air

Connect compressed-air hose (internal dia. of 6 mm) to coupling (Fig. 1).
Minimum supply pressure:7 bar
Working pressure: 6 bar
Pressure adjustment:
5.2

Electrical

.1
Permissible operating power is indicated on spec. plate (Fig. 2).
Note:
The operating voltage indicated on the specification plate refers to the control.
It is not necessarily applicable to the entire system!
.2
Connection must only be made if mains and operating voltage coincide.
.3
The machine must only be connected to a suitable earthed socket.
6

Switching the machine on

.1
Open compressed air supply.
.2
Check working pressure: 6 bar (gauge 3, Fig. 1)
.3
Re-adjust if necessary (regulating knob 2).
.4
Switch on machine (rotary switch 4 to "ON", Fig. 3)
7

Switching the machine off

Set tumbler switch 4 at "0" (fig. 3).