Power Wiring Connection Procedure - Daikin REYQ72TTJU Installation Manual

Vrv iv
Table of Contents

Advertisement

• Outside the units, the transmission wiring must be finished simulta-
neously with the local refrigerant piping, and wound with tape (field
supply) as shown in the figure below.
4
2
1
5
4
3
4
6
• For multi system:
1 Transmission wiring between outdoor units in the same piping
system must be connected to terminals Q1 and Q2 (TO MULTI
UNIT).
Connecting the wires to the F1, F2 (TO OUT/D UNIT) terminals
results in system malfunction.
2 Wiring to other systems should be connected to terminals F1 and
F2 (TO OUT/D UNIT) on the printed circuit board of the master
unit. The outdoor unit that connects transmission wiring to indoor
unit is the master unit. The others are sub unit.

9 .5 . Power wiring connection procedure

• Be sure to connect the power supply wiring to the power supply ter-
minal block and hold it in place using the included clamp as shown
in the figure below.
• The L1, L2 and L3 phases of the power wiring should be secured
separately to the hook using the included clamp (1).
• The ground wiring should be bound to the power wiring using the
included clamp (1) to prevent outside force from being applied to the
terminal area.
8
7
10
9
11
1
2
3
7
8
9
10
11
1
2
3
21
1
Suction gas pipe
2
High/Low pressure gas pipe
3
Liquid pipe
4
Insulation material
5
Finishing tape
6
Transmission wiring
REYQ72T
6
4
5
REYQ96-168T
6
4
5
1
Power supply
(MODEL TYDN: 3 – 460 V 60 Hz)
(MODEL TTJU: 3 – 208/230 V 60 Hz)
2
Branch switch, Overcurrent breaker
3
Ground wire
4
Control box
5
(Only REYQ – TYDN)
Control box (2)
6
(Only REYQ – TYDN)
Do not open the control box (2) cover.
(There are no work when installation.)
7
Attach insulation sleeves
8
Power supply terminal block
9
Ground terminal
10
Clamp (1) (accessory)
11
Vinyl tube (accessory)
CAUTION
• Be sure to use crimp-style terminal with insulating sleeves for con-
nections. (See the figure below.)
Crimp-style terminal
• For wiring, use the designated power wire and connect firmly, then
secure to prevent outside pressure being exerted on the terminal
board.
• Use an appropriate screwdriver for tightening the terminal screws.
A screwdriver with a small head will strip the head and make proper
tightening impossible.
• Over-tightening the terminal screws may break them.
See the following table for the tightening torque of the terminal
screws.
Screw size
M8 Power terminal
M8 Ground terminal
• When pulling the ground wire out, wire it so that it comes through
the cut out section of the cup washer. (See the figure below.) An
improper ground connection may prevent a good ground from being
achieved.
Crimp-style terminal
• When 2 wires are connected to a single terminal, connect them so
that the rear sides of the crimp contacts face each other. Also, make
sure the thinner wire is on top, securing the 2 wires simultaneously
to the resin hook using the included clamp (1).
Terminal
Crimp-style
block
terminal
Power wire
Insulating sleeve
Tightening torque
4.20-5.09 ft
lbf (5.7-6.9 N
m)
7.15-8.63 ft
lbf (9.7-8.63 N
m)
Cup washer
Cut out section
Wire : narrow
Wire : thick
Resin hook
3P362438-3H English

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents