D-Link ShareCenter DNS-320L User Manual page 382

2-bay cloud network storage enclosure
Hide thumbs Also See for ShareCenter DNS-320L:
Table of Contents

Advertisement

Section 4 - Configuration
Click on the Finish button if you are satisfied with all
Finished:
the settings of the Backup job created. Otherwise click
on the Previous button to go back and make changes.
Alternatively click on Exit to end the configuration
without adding a Remote Backup job.
Remote
Task: The name of the Remote Backup job.
Backups list:
Schedule: When the Remote Backup job will execute.
Status:.Current status which can be
•. Ready:. The remote backup job is ready to be
executed.
•. Finished: the remote backup job has executed
completely and successfully.
•.Failed: the Remote backup job was unsuccessful
during execution.
Enable/Disable: If the button shows a red circle the
remote backup job is enabled. Clicking the red button
will disable the remote backup job and the button will
change to a green right pointing triangle. Clicking the
green triangle will enable the job again.
Backup. now: Clicking this button will execute the
backup job immediately as long as the job is enabled.
Recovery: Clicking this button will write the backup
files and folders back into the source file system from
the backup target system (reverse the file direction).
Navigation.buttons: Use these buttons to move up
and down in the list when there are multiple jobs
configured.
Refresh.Button: Click this button during a backup or
recovery process to monitor the progress by updating
the progress completed bar.
DNS-320L
D-Link ShareCenter™
User Manual
376

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents