Part 13 – Start-Up Procedures With The Vision 1 Option - Munchkin Gas-Fired Hot Water Boiler Manual

Gas-fired hot water boiler
Hide thumbs Also See for Gas-Fired Hot Water Boiler:
Table of Contents

Advertisement

GAS-FIRED BOILER
PART 13: START-UP PROCEDURES WITH THE VISION 1 OPTION
CENTRAL HEATING CURVE
Factory Default
212
203
201˚
194
185
FUNCTION 9
176
167
158
149
131
122
113
104
95
FUNCTION 11
86
77
68
59
50
41
32
-59
-41
-24
-9
OUTSIDE TEMPERATURE (F)
Fig. 13-1
Function
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Fig. 13-3
DEFAULT RESET CURVE
0
9
63
99
27
45
81
68˚
CONTROL PROGRAM REFERENCE CHART
Default Setting
de
149 F
160 F
36 F
7 F
0 minutes
68 F
5 F
180 F
68 F
95 F
68 F
0 minutes
30 minutes
0
0
0
1
180°F
CENTRAL HEATING CURVE
Plot your Curve
212
203
194
185
176
167
158
149
131
122
113
104
95
86
77
68
59
50
41
32
-59
-41
-24
-9
OUTSIDE TEMPERATURE (F)
Fig. 13-2
Programmed Setting
No change allowed
No change allowed
No change allowed
Boiler Manual
(CONTINUED)
0
9
27
45
63
81
99
58

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heattransfer t-50Heattransfer t-80Heattransfer 399m

Table of Contents