Part 6 - Boiler Piping With Vision 1 System; Vision 1 System Piping; Zoning With Zone Valves Using Vision I; Zoning With Circulators Using Vision I - Munchkin Gas-Fired Hot Water Boiler Manual

Gas-fired hot water boiler
Hide thumbs Also See for Gas-Fired Hot Water Boiler:
Table of Contents

Advertisement

GAS-FIRED BOILER
PART 6. BOILER PIPING WITH VISION I SYSTEM
A. VISION I SYSTEM PIPING
It is important that the system piping is done
correctly when using the Vision 1 System.
Follow the piping diagrams 2A through 3G when
piping your Munchkin Boiler with Vision I. All
general piping practices should still be main-
tained.
B. ZONING WITH ZONE VALVES USING VISION I
1. Connect the boiler to the system as shown in
piping details 3A through 3C.
25
(DHW PRIORITY WITH OUTDOOR RESET)
2. Connect the DHW circulator (P2) directly to
the boiler as shown as shown in the piping
details. The boiler circulator (P1) will shut
down when there is a DHW demand.
C. ZONING WITH CIRCULATORS USING VISION I
1. Connect the boiler to the system as shown in
piping details 4A through 4G.
2. Connect the DHW circulator (P2) directly to
the boiler as shown in the piping details. The
boiler circulator (P1) will shut down when
there is a DHW demand.
Boiler Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heattransfer t-50Heattransfer t-80Heattransfer 399m

Table of Contents