Diagrams For Sidewall Venting - Munchkin Gas-Fired Hot Water Boiler Manual

Gas-fired hot water boiler
Hide thumbs Also See for Gas-Fired Hot Water Boiler:
Table of Contents

Advertisement

GAS-FIRED BOILER
J. DIAGRAMS FOR SIDEWALL VENTING
SIDEWALL VENTING WITH TEE (INTAKE)
AND COUPLING (EXHAUST)
TOP VIEW
EXHAUST
VENT
SUPPORT BRACKETS
MUST BE USED ON
ALL HORIZONTAL
AND VERTICAL PIPING
INTAKE AIR
VENT
RIGHT SIDE VIEW
EXHAUST
VENT
Figure 7-9
GENERAL NOTE: All vent pipes must be glued, properly supported and the exhaust must be pitched a
minimum of a ¼" per foot back to the heater (to allow drainage of condensate).
NOTE: When placing support brackets on vent piping, the first bracket must be within 1 foot of the
appliance and the balance at 4 foot invervals on the vent pipe. The boiler venting must be readily
accessible for visual inspection for the first three feet from the boiler.
INTAKE AIR
VENT
TEE
EXTERIOR WALL
1" MIN.
TEE
EXTERIOR WALL
SIDEWALL VENTING WITH TEE (INTAKE)
INTAKE AIR
VENT
STRAIGHT
COUPLING
EXHAUST
VENT
12" MIN.
STRAIGHT
COUPLING
SUPPORT BRACKETS
MUST BE USED ON
ALL HORIZONTAL
AND VERTICAL PIPING
Figure 7-10
Boiler Manual
AND COUPLING (EXHAUST)
1" MIN.
TOP VIEW
1" MIN.
RIGHT SIDE
VIEW
EXTERIOR WALL
TEE
12" MIN.
STRAIGHT
COUPLING
12" MIN.
STRAIGHT
COUPLING
TEE
42

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heattransfer t-50Heattransfer t-80Heattransfer 399m

Table of Contents