Disassembly Procedures - Yamaha DVD-C900 Service Manual

Hide thumbs Also See for DVD-C900:
Table of Contents

Advertisement

DVD-C900
QQ
3 7 63 1515 0

DISASSEMBLY PROCEDURES

1. Removal of Top Cover & Side Panels
a. Remove 8 screws ( q ) and also 3 screws ( w ) as
shown in Fig. 1.
2. Removal of Tray Ass'y
a. Remove 1 screw ( e ) as shown in Fig. 1.
b. Turn Gear/L0 as shown in Fig. 2 counter clockwise
gradually till immediately before the tray starts to
move and stop it there.
CAUTION : Gear/L0, if turned counter clockwise con-
tinuously, will mesh with the gear of the
tray and the tray will come out. When re-
moving the tray, use care so that Gear/L0
will not mesh with the gear of the tray.
c. Pull out the Tray Ass'y.
Precaution for installation of the Tray Ass'y.
On Tray Ass'y setting.
Check the Direction of marking " " on gear
according to this drawing.
TE
L 13942296513
Gear/L01
3. Removal of Table
a. Remove 2 screw ( r ) and then remove the Roller
Ass'y as shown in Fig. 3.
b. Remove the Plate/Table as shown in Fig. 3.
c. Remove 1 screw ( t ) and then take off the Table as
shown in Fig. 3.
Fit the table to the thick line on "
t
www
.
Plate/Table
7
http://www.xiaoyu163.com
(Remove parts in the order as numbered.)
Gear/L0
Front Panel
Fig. A
Marking
/
" mark.
r
x
ao
u163
y
i
Fig. 3
http://www.xiaoyu163.com
2 9
8
q
Side Panel
e
Tray
Q Q
3
6 7
1 3
1 5
Gear/L0
IMPORTANT : Installation of Table.
Install the table according to the following procedure.
1) Slide the Lever so that the Gear/RT becomes
free. (Fig.B)
2) With the " " mark on the Gear/RT aligned
with the same mark on the Tray, lock it with
the Lever. (Fig.B)
3) Install the Table by aligning it to the thick line
/
on "
" mark. (Fig.3)
*Check that the Table is locked after installation.
Gear/RT1
Tray
co
.
Lever
Lock
Unlock
9 4
2 8
Top Cover
w
Side Panel
q
Fig. 1
0 5
8
2 9
9 4
2 8
Tray
Fig. 2
Fit the Gear/RT to " " mark.
m
Fig. B
9 9
9 9

Advertisement

Table of Contents
loading

Table of Contents