MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OpENING
Roof pitch
Flat
to 6/12
Over 6/12 to 8/12
Over 8/12 to 10/12
Over 10/12 to 12/12
Over 12/12 to 16/12
Over 16/12 to 20/12
2. All other gas vents shall terminate not less than 2 feet (0.6m)
above the highest point where they pass through the roof and at
least 2 feet (0.6m) higher than any portion of a building located
within 10 feet (3.1m) as shown in the following illustration.
10ft. or less
Vent Cap
Type B
Vent Pipe
Type B
(Double Wall)
Storm Collar
Boot Flashing
2" Clearance
Seal joint &
annular space.
Vent Pipe
(Single Wall)
c) Horizontal Through the Sidewall
This heater, when horizontally vented, must be installed with the
approved venting system.
When venting the heater horizontally through a combustible
outside wall, the same requirements listed previously for Venting
Through the Roof apply except as follows:
1. When venting the heater to the outside of the building through
a sidewall, use 3 inch O.D. single-wall metal pipe. This is to
be constructed of galvanized sheet metal or other approved
noncombustible, corrosion-resistant material as indicated by state
and/or local codes.
2. For horizontal venting, the vent lengths may be as follows:
Minimum Equivalent Length = 5 feet of Pipe
Maximum Equivalent Length = 25 feet of Pipe
Use the following correction factors to obtain the equivalent
length:
a) Subtract 15 feet if the run is horizontal
b) Subtract 10 feet for an approved vent cap.
c) Subtract 10 feet for each elbow beyond 15 feet from the heater.
d) Subtract 15 feet for each elbow within 15 feet of the heater.
Mr. Heater | Gas-Fired Low-Intensity Infrared Heater
H (Min)
1.0 Feet
1.5 Feet
2.5 Feet
4.0 Feet
6.0 Feet
7.5 Feet
2ft. min.
NOTE: To minimize problems associated with
condensation in long runs, vent pipe can be
insulated.
3. The horizontal venting system approved with this heater consists
of the Side Wall Vent Kit (02840) shown are page 3.
4. Limit the quantity of 90° elbows to two. When vent pipe is in a
horizontal run, it must be pitched downward ¼ inch per foot
towards the vent terminal. The heater must be installed level.
5. The horizontal venting system shall not terminate:
a) Less than 4 feet (1.2m) below, 4 feet (1.2m) horizontally from,
or 1 foot (30cm) above any door, window or gravity air inlet into
any building. The bottom of the vent terminal shall be located
at least 7 feet (2.1m) above grade or above snow accumulation
levels as determined by local codes.
b) Less than 3 feet (0.9m) from a combustion air inlet.
c) Less than 3 feet (0.9m) from any other building opening or any
gas service regulator.
d) Directly over areas where condensate or vapor could create a
nuisance or hazard or be harmful to the operation of gas utility
meters, regulators, relief valves, or other equipment. Building
materials should be protected from flue gases and condensate.
6. In regions of the country where prevailing winds are consistently
higher than 40 mph, it may be necessary to terminate the vent
system above the roof level.
Vent Cap
18"
Venting/Ducting
For Commercial and Industrial Installations
Only

General Requirements

Use aluminum or teflon tape suitable for 550°F (3M Company tapes
#433 or #363) or RTV silicone sealant.
Heater must be vented in accordance with specification ANSI Z223.1
- latest revision. Partial information relating to this specification is
provided in this section with regard to size and configurations for
venting arrangements. For complete information consult ANSI
Z223.1 - latest revision and applicable local codes. Use the following
guidelines to help insure an adequate, safe ventin arrangement.
14
Operating Instructions and Owner's Manual
Type "B" Vent
Wall Thimble
Wall
Single-Wall
Vent Pipe

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hst45

Table of Contents