Front View - State Water Heaters SHE 50-100 NE Service Handbook

Commercial / residential gas water heaters series 120 & 121
Hide thumbs Also See for SHE 50-100 NE:
Table of Contents

Advertisement

FRONT & BACK VIEWS
TOP COVER
ON / OFF SWITCH
UIM
(user interface module)
CONTROL INTERFACE
COVER.
TEMPERATURE
PROBE - LOCATED
BEHIND CONTROL
INTERFACE COVER
TANK GLASSING
PLUG COVER.
USED FOR
MANUFACTURING
PURPOSES ONLY.
DO NOT REMOVE
GLASSING PLUG
FOR ANY SERVICE
OR MAINTENANCE.
COVER MAY BE
REMOVED IF LEAK
IS SUSPECTED.
8
FEATURES AND COMPONENTS

FRONT VIEW

HEATING LOOP
RETURN LINE
CONNECTION
3/4 INCH NPT
DRAIN VALVE
2 INCH PVC
INTAKE AIR
CONNECTION
HEATING LOOP
SUPPLY LINE
CONNECTION
3/4 INCH NPT
TEMPERATURE
PRESSURE
RELIEF VALVE
BLOCKED EXHAUST
SWITCH SENSING TUBE
EXHAUST ELBOW
(2 INCH PVC VENT
CONNECTION)
CONDENSATE
DRAIN CONNECTION
BACK VIEW

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

She 50-100 peGp650 ytpdtGp650 htpdt

Table of Contents