Mast Installation Instructions
Earth bonding
lead
Attach free end (large
tag M10) to Tower Metal
work – NB On no ac-
count must this be at-
tached to the mount-
ing bracket bolts!!
Step 1: Your equipment will already have the
mounting bracket fitted.
Do
not
remove
bracket.
The pre-fitted earth bonding lead is secured
after the unit is mounted.
Step 2: Attach the Bracket mount to the pole
using the bracket strap and either
x 40mm or M8 x 70mm bolts, as required, M8
flat washers and M8 coil washers as shown.
Tighten to ensure the
can
be
adjusted.
1" (26mm) and 2"(50mm) reverse the
bracket.
Step 3:
Offer up the unit to the bracket
mount and affix using the captive M8 bolt.
Tighten to ensure the assembly grips but can
be adjusted on the pole.
Step 4: Adjust the elevation and azimuth of
the unit before tightening
torque settings of 14Nm
(11lbft) for both bolts.
Warning ! Do not over tighten.
8
pre-fitted
mounting
M8
assembly grips but
For
poles
between
to the required