UTICA BOILERS UB90 125 Installation Manual And Operating Instructions page 36

Gas-fired direct vent condensing hot water boiler
Table of Contents

Advertisement

CHART 1
OPEN
BLOWER STARTS
YES
PURGE LIGHT ON?
YES
15 SECOND PRE PURGE COMPLETE.
PURGE LIGHT IS OFF. SIMULTANEOUSLY
IGNITOR LIGHT IS ON AS IGNITOR CIRCUIT
IS ENERGIZED.
YES
CHART 4
TROUBLESHOOTING
TROUBLESHOOTING CHART #3
NO
CHECK FOR VAC
BETWEEN TERMINALS 1 AND 3
AT CONNECTOR CN4 ON IBC
YES
CHECK FOR 120 VAC AT
BLOWER LEADS ON WIRING
HARNESS
YES
REPAIR/REPLACE
BLOWER
IBC WAITS UP TO 5
MINUTES FOR NORMALLY
OPEN AIR
NO
PRESSURE SWITCH
CONTACTS TO CLOSE,
INDICATING BLOWER
SUCTION IS
PRESENT
NO
NO
REPLACE IBC
REPAIR/REPLACE
NO
WIRING FROM IBC
TO BLOWER
PRESSURE SWITCH
CONTACTS
OPEN
ARE ORIFICE IN
NEGATIVE PRESSURE
HOSE CLEAR?
YES
ARE VENT PIPE AND AIR
INTAKE PIPE CLEAR
(NO BLOCKAGE)
YES
CHECK AIR
PRESSURE SWITCH PER
INSTRUCTIONS ON
FOLLOWING PAGES. ARE
SAMPLING LINES CLEAR
AND CONNECTED
PROPERLY?
YES
CHECK FLUE PASSAGES
IN BOILER PER
"MAINTENACE AND
CLEANING". ARE FLUE
PASSAGES IN BOILER CLEAN?
YES
CHECK DRAFT INDUCER
MOTOR RPM. IS IT
3400-3600?
YES
CHECK FOR BROKEN OR
LOOSE IMPELLER ON DRAFT
INDUCER AND REPLACE
BLOWER IF FOUND TO
BE BROKEN OR LOOSE
REPLACE IBC
36
NO
CLEAN OUT BLOCKAGE
AT ORIFICE
CLEAN OUT VENT PIPE
AND/OR AIR INTAKE PIPE.
CHECK FOR SAGS OR
NO
LOW SPOTS WHERE
CONDENSATE MAY
PUDDLE AND BLOCK
THE VENT
CLEAN OUT SAMPLING
NO
LINES OR REPLACE
DEFECTIVE SWITCH
CLEAN BOILER FLUE
NO
PASSAGES PER
MAINTENANCE AND
CLEANING INSTRUCTIONS
NO
REPLACE
BLOWER

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ub90 175Ub90 200Ub90 150

Table of Contents